top of page

WE CAN HANDLE YOUR REPAIR NEEDS!

Power Generation Systems

..IDG test apparatus.jpg
  • IDG's

  • CSD's

  • Voltage Regulators

  • Relays

  • Generators

  • APU Generators

  • Generator Control Units

  • Starter Generators

EMC is uniquely equipped to handle many of the components that together make up the Power Generation Systems.

Our BRAND NEW, specifically built Testek G938 500-HP powerhouse is fully computerized and capable of 38,000 RPM's and  150-KVA Load, which makes EMC able to service Boeing, Airbus, CRJ, and Bombardier IDG's, Generators, and APU Starter Generators.​

BA03604 Generator
30086-011 DC Generator.jpg
755469E IDG
1706903 IDG_edited_edited.png

Pneumatic Systems

Pneumatic Test Stand Bauer
  • Starter Valves

  • Check Valves

  • Flow Control Valves

  • Temperature Sensors

  • Shut-Off Valves

  • Anti-Ice Valves

  • High Pressure Valves

  • Low Pressure Valves

Our Pneumatic Test Stand, manufactured specifically for EMC by Bauer, Inc., in conjunction with pressure vessels allow us to deliver the required air flow and heated temperatures to simulate the functionality of each component.

396480-1 Flow Control and Shut-Off Valve
3291172-2 Pneumatic Butterfly Shut-Off V
790270-12 HIGH PRESSURE SHUTOFF VALVE.jpg
773288-10 PRESSURE REGULATING AND SHUTOFF VALVE.jpg

Hydraulic Systems

..Hydraulic Test Stand.jpg
  • Hydraulic Pumps

  • Pump and Motor Packages

  • Check and Pressure Valves

  • Power Control Units

  • Rudder Controls

  • Servo Valves

  • Accumulators

  • LG Actuators

  • Cylinders

  • Assisters

  • Dampers

The Hydraulic Test Stand is comprised of three test stands, The Engine Driven, Pump and Red Fluid 5606 for all your hydraulic needs, commercial or military.

DSC_0199.JPG
DSC_0238.JPG
63169 HYDRAULIC TRANSFER UNIT.jpg
66068-08 Variable Delivery Hydraulic Pump.jpg

Fuel Boost Pump Systems

Fuel Booster Pump Test Stand.jpg

Introducing our latest capital investment in cutting-edge testing technology: the 2024 Bauer Fuel Boost Pump Test Stand. Designed to meet the highest standards of performance and precision, this advanced test stand is engineered with an expanded fuel tank and a state-of-the-art computerized control center, enabling a comprehensive range of simulations for A319, A320, A321, A330, A340, B737, B747, B757, B777, B787, ERJ-170, ERJ-190 and MD-11 Fuel Boost Pumps.

Key features include multiple fuel tank modules—Stationary, 2-Tilt, 3-Tilt, and Inverted—to replicate various aircraft movements such as pitch, roll, and yaw. This innovative system mimics in-flight dynamics, providing highly accurate testing of fuel pumps mounted under the wing.

This investment reinforces our commitment to quality, offering unmatched testing capabilities that ensure reliability, safety, and top-tier performance for all our clients.

5006286G PUMPING UNIT ASSEMBLY.JPEG

Air Turbine Engine Starter Systems

Starter Test Stand.png

Our Testek Solutions Model 102382-P17 Air Turbine Starter Test Stand combines a pneumatic circuit, an electrical circuit, a starter fixture, and a Data Acquisition System (DAS) into an integrated system with all the necessary instrumentation to pre-overhaul and post-overhaul test aircraft pneumatic engine starters across all types of platforms.

3505953-4 AIR TURBINE ENGINE STARTER.jpg
383342-14 AIR TURBINE ENGINE STARTER.jpg
775550-3 Pneumatic Starter_edited.png
784750A4, Pneumatic Starter.jpg
bottom of page